Like’s Creek Fish Passage Project (II)
#12-1459 #12-1459
 Oakland Bay / Hammersley Inlet Goldsborough Creek Like’s Creek Fish Passage Project (II)
Organization Kennedy-Goldsborough Basin (WRIA 14) Salmon Recovery Lead Entity
Sponsor South Puget Sound Salmon Enhancement Group (SPSSEG)
Status Completed
Schedule Start Date: 12/6/2012 End Date: 5/3/2017
Category Category: Restoration
Project Photo
DESCRIPTION
This project addressed five fish passage barriers to fully restore anadromous fish access to Like's Creek, a major tributary to Goldsborough Creek west of Shelton, WA. Fish access was previously blocked by two separate full-barrier culverts within the lower section of the creek. The first culvert, under the Simpson railroad, was within approximately 200 feet of the confluence of Like's Creek and Goldsborough Creek. The second blocking culvert was approximately 150 feet upstream, under Carman Road North, a County road. Three additional partial barriers occurred in the upper section of the creek, beginning approximately 900 feet upstream of the second culvert. The South Puget Sound Salmon Enhancement Group (SPSSEG) partnered with Mason County to have each of the two lower barriers replaced with 12-foot wide stream simulation design culverts. SPSSEG, Green Diamond Resource Company and Mason Conservation District partnered to have all three of the upper, partial barriers completely removed. This project opened spawning and rearing habitat within Like's Creek that has not been accessible to any migratory or anadromous fish for several decades. The estimated upstream fish habitat made available by the project is approximately 1 mile. Like's Creek currently supports Coho salmon and Cutthroat Trout. Steelhead trout and Chum may also benefit in the future.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/24/2012South Puget Sound Salmon Enhancement Group (SPSSEG)Match$41,107.00
Requested08/24/2012Recreation and Conservation Office (RCO)Salmon State Projects$232,942.00
Allocated05/03/2017Recreation and Conservation Office (RCO)Salmon State Projects$11,141.05
Allocated05/03/2017South Puget Sound Salmon Enhancement Group (SPSSEG)Match$43,118.15
Allocated05/03/2017Recreation and Conservation Office (RCO)Salmon Federal Projects$233,120.07
Spent09/19/2016Recreation and Conservation Office (RCO)Salmon State Projects-$11,141.05
Spent05/03/2017South Puget Sound Salmon Enhancement Group (SPSSEG)Match-$43,118.15
Spent05/03/2017Recreation and Conservation Office (RCO)Salmon Federal Projects-$233,120.07
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$274,049.00 $274,049.00 $287,379.27 $287,379.27 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Mason
HUC12:Goldsborough Creek (171100190605)
HUC8:Puget Sound (17110019)
Lead Entity Area:WRIA 14
Legislative District:35
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:15
Steelhead-Pop (ESU):Steelhead-Puget Sound, South Puget Sound Tributaries, Threatened
Township:T20NR04W
Watershed Administrative Unit:Mason
WRIA:Kennedy - Goldsborough
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.05mi0.05mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
1.00mi1.02mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
5.00
Square Miles Of streambed made accessible (C.2.b.2)
0.10sq mi
 Culvert installed or improved (C.2.f.1)    
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
1.00mi0.30mi
Number of culverts (C.2.f.2)
2.002.00
 Road-crossing removal (C.2.i.1)    
Miles of stream made accessible by road crossing removal (C.2.i.3)
0.72mi
Number of road-crossings (C.2.i.2)
3.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.01mi0.01mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.10acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.01mi0.01mi
Number of structures placed in channel (C.4.d.7)
7.004.00
Pools Created through channel structure placement (C.4.d.5)
1.002.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
3.00yd