Skookum Creek LWD, Phase II
#05-1442 #05-1442
Organization Kennedy-Goldsborough Basin (WRIA 14) Salmon Recovery Lead Entity
Sponsor Squaxin Island Tribe
Status Completed
Schedule Start Date: 4/2/2006 End Date: 4/24/2008
Category Category: Restoration
Project Photo
DESCRIPTION
Squaxin Island Tribe added over 60 logs, including 20 key pieces, in several log jams over 300 feet of the highly incised mainstem of Skookum Creek near Shelton to create pool-riffle and cover structure. In addition, over 2000 cubic yards of streambank material was excavated to begin to form a new floodplain. The disturbed area was revegetated with native plants. The work was conducted as Phase II of a watershed restoration effort to mitigate for channel impairment. Phase I was completed in summer 2005. Each phase is an intermediate step until the riparian buffers mature sufficiently to reestablish the process of natural wood recruitment into the stream channel. The project site (T19N, R3W, S19) was located within the Squaxin Island Tribe's homeland boundaries between RM 1.0 and 2.0 of Skookum Creek. This watershed is included in the usual and accustomed grounds of the Squaxin Island Tribe (SIT) reserved in 1854 Medicine Creek Treaty with the U.S. Government. Declines in habitat quantity and quality along with poor ocean returns threatened the continued survival of naturally reproducing chum and coho populations of Skookum Creek. Timing was critical because land-use change was accelerating in this valley and threatening salmonid habitat. Literature (Montgomery et al, 2003; Abbe et al, 2003) supports the ecological role and overwhelming importance of LWD in Northwest streams. Without regular and ongoing recruitment of large confers into the stream channel, channel hydraulics and the ability to transport and store sediment had become impaired.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested09/22/2005Squaxin Island TribeMatch$20,000.00
Requested09/22/2005Recreation and Conservation Office (RCO)Salmon State Projects$94,810.00
Allocated01/06/2006Squaxin Island TribeMatch$20,000.00
Allocated01/06/2006Recreation and Conservation Office (RCO)Salmon State Projects$94,810.00
Spent02/22/2008Squaxin Island TribeMatch-$20,000.00
Spent02/22/2008Recreation and Conservation Office (RCO)Salmon State Projects-$94,810.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$271,710.00 $114,810.00 $114,810.00 $114,810.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Mason
HUC12:Skookum Creek-Frontal Little Skookum Inlet (171100190603)
HUC8:Puget Sound (17110019)
Lead Entity Area:WRIA 14
Legislative District:35
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:19
Steelhead-Pop (ESU):Steelhead-Puget Sound, South Puget Sound Tributaries, Threatened
Township:T19NR03W
Watershed Administrative Unit:Mason
WRIA:Kennedy - Goldsborough
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.15mi0.08mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.45mi0.08mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
0.00acres
Instream Pools Created/Added (C.4.c.6)
0.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.00mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.08mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.09acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.08mi
Number of structures placed in channel (C.4.d.7)
5.00
Pools Created through channel structure placement (C.4.d.5)
5.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
10.00yd
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
0.30acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.08mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
0.26acres
ADDITIONAL INFORMATION