McDonald Land Company #1 Lynch Creek
#03-1378 #03-1378
 Totten / Little Skookum Inlet Lynch Creek McDonald Land Company #1 Lynch Creek
Organization Kennedy-Goldsborough Basin (WRIA 14) Salmon Recovery Lead Entity
Sponsor South Puget Sound Salmon Enhancement Group (SPSSEG)
Status Completed
Schedule Start Date: 4/30/2004 End Date: 1/24/2006
Category Category: Restoration
Project Photo
DESCRIPTION
The Lynch Creek Fish Passage Project will remove a partial fish passage barrier and replace it with an adequately sized structure that will allow unimpeded migration of adult and juvenile salmonids, and downstream transport of large woody debris, streambed material, and high flows. The existing pipe is located at approximately river mile 0.5 on a logging road that crosses Lynch Creek in Mason County. Lynch Creek (14.0026) is an independent tributary to Little Skookum Inlet, is two miles in length, and has small runs of coho, chum, cutthroat, and steelhead trout. The culvert was identified during the WRIA 14 Fish Passage Inventory and selected as an eligible and beneficial project under the FFFPP program. SPSSEG will work with a contracted engineer, WDFW and the landowner to develop a solution to the fish passage impediment and road maintenance concerns. This project will restore access to 1.5 miles of spawning and rearing habitat, while reducing the risk of road failure and damage to downstream habitat.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested06/14/2004South Puget Sound Salmon Enhancement Group (SPSSEG)Match$8,598.00
Requested06/14/2004Recreation and Conservation Office (RCO)FFFPP Grants$38,402.00
Allocated01/24/2006Recreation and Conservation Office (RCO)FFFPP Grants$46,580.85
Spent01/24/2006South Puget Sound Salmon Enhancement Group (SPSSEG)Match-$0.00
Spent01/24/2006Recreation and Conservation Office (RCO)FFFPP Grants-$46,580.85
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$46,580.85 $47,000.00 $46,580.85 $46,580.85 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Mason
HUC12:Skookum Creek-Frontal Little Skookum Inlet (171100190603)
HUC8:Puget Sound (17110019)
Lead Entity Area:WRIA 14
Legislative District:35
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:04
Steelhead-Pop (ESU):Steelhead-Puget Sound, South Puget Sound Tributaries, Threatened
Township:T19NR03W
Watershed Administrative Unit:Mason
WRIA:Kennedy - Goldsborough
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.00mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
1.50mi1.50mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Miles Of Stream Made Accessible (FFFPP)
Square Miles Of streambed made accessible (C.2.b.2)
 Culvert installed or improved (C.2.f.1)    
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
1.50mi1.50mi
Number of culverts (C.2.f.2)
1.00
 Fish passage blockages removed or altered (C.2.c.1)    
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1.001.00
 Road-crossing removal (C.2.i.1)    
Miles of stream made accessible by road crossing removal (C.2.i.3)
0.00mi0.00mi
Number of road-crossings (C.2.i.2)