Gull Harbor Estuary Barrier Removal
#10-1757 #10-1757
 Budd Inlet Nearshore Gull Harbor Estuary Barrier Removal
Organization WRIA 13 Salmon Habitat Recovery Lead Entity
Sponsor Capitol Land Trust
Status Completed
Schedule Start Date: 10/7/2010 End Date: 2/4/2013
Category Category: Restoration
DESCRIPTION
This grant proposal is part of a larger Budd to Henderson Costal Conservation Initiative which seeks to expand nearshore and upland protection between Gull Harbor (in Budd Inlet) and Woodard Bay (in Henderson Inlet) and create a 600-acre protected overland corridor linking the two inlets located in Thurston County. This initiative has already conserved over 150 acres in Gull Harbor, and has received grant funding to conserve parts of the last major unprotected areas between Gull Harbor and Woodard Bay. The objective of this project was to restore salmonid habitat and facilitate fish passage into what was historically a salmon-bearing tributary to Gull Harbor. Working with the landowner and an engineering consultant, Capitol Land Trust removed an approximately 1/4-acre impoundment formed by an embankment dam at the northeast end of the Gull Harbor estuary. Water discharged from the impoundment through a concrete outlet structure (overflow weir) into two 18-inch diameter culverts and into the Gull Harbor Estuary. The embankment dam and outlet structure were an anadromous fish barrier, preventing natural stream and estuary function, and forming an artificial barrier between Gull Harbor estuary and the stream. The causway/dam was replaced with a 50' pre-fab bridge, and part of the upstream portion of the creek was re-aligned to better match a natural stream channel.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/25/2010Capitol Land TrustMatch$29,133.00
Requested08/25/2010Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$165,089.00
Allocated10/28/2012Capitol Land TrustMatch$31,790.00
Allocated10/28/2012Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$180,089.00
Spent02/04/2013Capitol Land TrustMatch-$31,790.00
Spent02/04/2013Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$180,089.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$211,879.00 $194,222.00 $211,879.00 $211,879.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Thurston
HUC12:Ellis Creek-Frontal Budd Inlet (171100190503)
HUC8:Puget Sound (17110019)
Lead Entity Area:WRIA 13
Legislative District:22
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:45
Steelhead-Pop (ESU):Steelhead-Puget Sound, South Puget Sound Tributaries, Threatened
Township:T19NR02W
Watershed Administrative Unit:Lower Deschutes
WRIA:Deschutes
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.10mi0.10mi
Estuarine / Nearshore Project    
*Total Amount Of Estuarine / Nearshore Acres Treated (C.9.b)
0.25acres0.25acres
 Dike Or berm modification / removal (C.9.d.1)    
Acres of Habitat Made Available To Salmonids through dike or berm modification/removal (C.9.d.3)
0.60acres0.60acres
Miles Of Dikes Modified/Removed (C.9.d.2)
0.00mi0.00mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
0.10mi0.10mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Square Miles Of streambed made accessible (C.2.b.2)
0.00sq mi0.00sq mi
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
0.10mi0.10mi
Number of bridges (C.2.g.2)
1.00
 Fish passage blockages removed or altered (C.2.c.1)    
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1.001.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.10mi0.10mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.70acres0.70acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.10mi0.10mi
Number of structures placed in channel (C.4.d.7)
5.005.00
Pools Created through channel structure placement (C.4.d.5)
1.001.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
2.00yd2.00yd
ADDITIONAL INFORMATION