Mission Creek Estuary Restoration
#11-1526 #11-1526
 Budd Inlet Nearshore Mission Creek Estuary Restoration
Organization WRIA 13 Salmon Habitat Recovery Lead Entity
Sponsor Port of Olympia
Status Completed
Schedule Start Date: 12/8/2011 End Date: 3/12/2014
Category Category: Restoration
Project Photo
DESCRIPTION
South Puget Sound Salmon Enhancement Group (SPSSEG) restored fish and tidal access to Mission Creek and the shoreline surrounding the stream's outlet. Mission Creek flows through Priest Point Park and discharges into Budd Inlet, Puget Sound near Olympia, WA. An earthen road embankment was constructed in the early 20th century to provide vehicle access across the mouth of Mission Creek. An overflow weir box and outlet culvert were installed to manage freshwater discharge and limit saltwater inundation into the area upstream of the road embankment. The existing road embankment and culvert severly impacted upstream fish passage and limited estuarine function at the site. This restoration project focused on removing human induced stressors, including the road embankment, culvert, beach armor, invasive vegetation, and removed some sediment to help reclaim the small estuary. This project benefits estuarine usage for Chinook, coho, and chum that utilize embayments in Budd Inlet. The Mission Creek project was identified in many local and regional watershed planning efforts including the WRIA 13 Three-Year workplan. A conceptual design memo for Mission Creek was completed in 2006 by SPSSEG, and updated in 2011 by PSNERP. The Mission Creek Estuary Restroation project was a collaboration with the Port of Olympia, City of Olympia, and South Puget Sound Salmon Enhancement Group.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/23/2011Recreation and Conservation Office (RCO)Salmon State Projects$60,000.00
Requested08/23/2011Port of OlympiaMatch$120,000.00
Allocated03/12/2014Recreation and Conservation Office (RCO)Salmon Federal Projects$80,185.00
Allocated03/12/2014Port of OlympiaMatch$120,000.00
Spent11/06/2013Recreation and Conservation Office (RCO)Salmon State Projects-$0.00
Spent03/12/2014Recreation and Conservation Office (RCO)Salmon Federal Projects-$80,185.00
Spent03/12/2014Port of OlympiaMatch-$120,000.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$180,000.00 $180,000.00 $200,185.00 $200,185.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
SECONDARY SPONSOR
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
City Areas:Olympia
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Thurston
HUC12:Ellis Creek-Frontal Budd Inlet (171100190503)
HUC8:Puget Sound (17110019)
Lead Entity Area:WRIA 13
Legislative District:22
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:53
Steelhead-Pop (ESU):Steelhead-Puget Sound, South Puget Sound Tributaries, Threatened
Township:T18NR02W
Watershed Administrative Unit:Lower Deschutes
WRIA:Deschutes
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.00mi
Estuarine / Nearshore Project    
*Total Amount Of Estuarine / Nearshore Acres Treated (C.9.b)
0.50acres0.50acres
 Beach nourishment (C.9.l.1)    
Acres Treated for beach nourishment (C.9.l.4)
0.10acres0.10acres
Cubic Yards Of Beach Substrate Placed (C.9.l.2)
300.00cubic yds300.00cubic yds
Miles of Shoreline Treated for beach nourishment (C.9.l.3)
0.10mi0.10mi
 Culvert modification / removal (C.9.f.1)    
Acres Opened To Fish Passage through culvert modification/removal (C.9.f.3)
5.00acres5.00acres
Miles of stream made accessible by removal or modification of culvert
Number of Culverts Modified/Removed To Allow Fish Passage (C.9.f.2)
1.001.00
 Dike Or berm modification / removal (C.9.d.1)    
Acres of Habitat Made Available To Salmonids through dike or berm modification/removal (C.9.d.3)
5.00acres5.00acres
Miles Of Dikes Modified/Removed (C.9.d.2)
0.10mi0.10mi