Deschutes RM 34.5 In-stream Complexity
#19-1443 #19-1443
 Budd Inlet Deschutes River Deschutes RM 34.5 In-stream Complexity
Organization WRIA 13 Salmon Habitat Recovery Lead Entity
Sponsor South Puget Sound Salmon Enhancement Group (SPSSEG)
Status Completed
Schedule Start Date: 12/12/2019 End Date: 8/2/2024
Category Category: Restoration
DESCRIPTION
The upper Deschutes (RM 31041) is high priority for rearing, spawning and egg incubation yet the reach lacks LWD, habitat complexity (pools) & stability. The Coho Recovery Report modeled a 7% decrease in fine sediment and 25% increase in LWD (Scenario A) to have the second largest impact on Coho survival; the first being increased marine survival. Specifically identified is treatment of the area between Fall creek (RM 35) and Pipeline creek (rm 31) to reduce fine sediment input that reduces egg to emergence survival. The RM 33 Instream Channel Complexity & Riparian Planting project addressed the above limiting factors by adding stable large wood (pieces & structures) for pool formation, gravel bar formation, increased retention and decreased summer channel width to increase water depth. Project goals also include increasing riparian vegetation for long-term sediment reduction and stream shading. This site was identified through the WRIA 13 three-year implementation priority list, watershed outreach and inquiries from the former landowner. Lack of LWD is a limiting factor for the Deschutes River as is an excess of fine sediment, lack of riparian cover and temperature. This project addresses all of these. This project seeks to restore the aquatic habitats on approximately 1,500 linear feet of river channel in the reach by increasing the amount of large woody debris, re-establishing native riparian forest and creating in-stream complexity. A conceptual design, funded with a g
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/01/2019South Puget Sound Salmon Enhancement Group (SPSSEG)Match$105,000.00
Requested08/01/2019Recreation and Conservation Office (RCO)Salmon State Projects$595,000.00
Allocated08/02/2024South Puget Sound Salmon Enhancement Group (SPSSEG)Match$71,383.72
Allocated08/02/2024Recreation and Conservation Office (RCO)Salmon Federal Projects$101,039.00
Allocated08/02/2024Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration$303,468.73
Spent12/26/2023Recreation and Conservation Office (RCO)Salmon State Projects-$0.00
Spent03/13/2024Recreation and Conservation Office (RCO)Salmon Federal Projects-$101,039.00
Spent08/02/2024South Puget Sound Salmon Enhancement Group (SPSSEG)Match-$71,383.72
Spent08/02/2024Recreation and Conservation Office (RCO)Puget Sound Acq. & Restoration-$303,468.73
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$679,000.00 $700,000.00 $475,891.45 $475,891.45 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Puget Sound, Threatened
Chum-Pop (ESU):Chum-Puget Sound/Strait of Georgia, Not Warranted
Coho-Pop (ESU):Coho-Puget Sound/Strait of Georgia, Species of Concern
County:Thurston
HUC12:Lake Lawrence-Deschutes River (171100160102)
HUC8:Deschutes (17110016)
Lead Entity Area:WRIA 13
Legislative District:02
Pink-Pop (ESU):Pink-Odd Year, Not Warranted
Puget Sound Action Areas:South Puget Sound
Salmon Recovery Regions:Puget Sound
Sections:02
Steelhead-Pop (ESU):Steelhead-Puget Sound, Threatened
Township:T15NR02E
Watershed Administrative Unit:Middle Deschutes
WRIA:Deschutes
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.28mi0.28mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.50mi0.50mi
 Channel structure placement (C.4.d.1)    
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.30mi0.30mi
Number of structures placed in channel (C.4.d.7)
6.007.00
Pools Created through channel structure placement (C.4.d.5)
4.005.00
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
1.00acres1.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.20mi0.20mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
1.00acres1.00acres
Miles of streambank planted (C.5.c.4)
0.20mi0.20mi