Abernathy Creek Cameron Site
#14-1311 #14-1311
Organization Lower Columbia Fish Recovery Board Lead Entity
Sponsor Cowlitz Indian Tribe
Status Completed
Schedule Start Date: 9/18/2014 End Date: 3/20/2018
Category Category: Restoration
DESCRIPTION
The Cowlitz Indian Tribe proposes to add large wood jams and smaller accumulations to lower Abernathy Creek near Longview, Cowlitz County to improve habitat conditions for Washington coast winter steelhead and Lower Columbia coho, Chinook, and chum.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested04/10/2014Recreation and Conservation Office (RCO)Salmon State Projects$432,900.00
Allocated03/20/2018Recreation and Conservation Office (RCO)Salmon State Projects$430,939.19
Spent03/15/2018Cowlitz Indian TribeMatch-$0.00
Spent03/15/2018Recreation and Conservation Office (RCO)Salmon State Projects-$430,939.19
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$340,000.00 $432,900.00 $430,939.19 $430,939.19 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Lower Columbia River, Mill, Abernathy, and Germany Creeks, Threatened
Chum-Pop (ESU):Chum-Columbia River, Mill, Abernathy, and Germany Creeks, Threatened
Coho-Pop (ESU):Coho-Lower Columbia River, Mill, Abernathy, and Germany Creeks Late, Threatened
County:Cowlitz
HUC12:Abernathy Creek (170800030604)
HUC8:Lower Columbia-Clatskanie (17080003)
Lead Entity Area:Lower Columbia River
Legislative District:19
Lower Columbia Basins:Mill-Abernathy-Germany
Lower Columbia Estuary:Volcanics Current Reversal
Salmon Recovery Regions:Lower Columbia River
Sections:39
Steelhead-Pop (ESU):Steelhead-Washington Coast, Not Warranted
Township:T08NR04W
Watershed Administrative Unit:Abernathy
WRIA:Grays - Elochoman
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.30mi0.60mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.30mi0.60mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
0.10acres0.10acres
Instream Pools Created/Added (C.4.c.6)
7.000.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.00mi0.00mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.30mi0.60mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
2.20acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.30mi0.60mi
Number of structures placed in channel (C.4.d.7)
35.0027.00
Pools Created through channel structure placement (C.4.d.5)
7.0015.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
1.80acres1.80acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.30mi0.30mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
1.80acres1.80acres
Miles of streambank planted (C.5.c.4)
0.30mi0.30mi
 Riparian Plant removal / control (C.5.h.1)    
Acres of riparian treated for plant removal/control (C.5.h.3)
1.80acres1.80acres
Miles of streambank treated for plant removal/control (C.5.h.4)
0.30mi0.30mi