Camp Cr at Schafer Boom Rd Fish Psg Construction
#24-2564 #24-2564
Organization Chehalis Basin Lead Entity
Sponsor Chehalis Basin Fisheries Task Force (CBFTF)
Status Approved
Schedule Start Date: 10/2/2024 End Date: 6/30/2026
Category Category: Restoration
DESCRIPTION
CBFTF is seeking funding to correct a fish barrier on a county road (Schafer Boom Road) at river mile 0.55 of Camp Creek, including some channel realignment and planting. This project would increase access to 5.65 miles of salmonid habitat along Camp Creek which is used by steelhead, coho, and chum. This barrier was selected for correction because it was in the top 5% of all barriers in the Chehalis prioritization list. This barrier scored highly in the prioritization criteria because it is low in the watershed and would provide increase access to important salmonid habitat. Several other upstream and downstream barriers in this system have already been corrected, including a culvert on Hwy 12 being corrected by WSDOT in 2024 as part of the 2013 injunction. This project would replace a 67% passable culvert (6.5' diameter by 36' long) with a bridge approximately sized for the stream flow and future flood conditions (27.5' wide by 39' long).
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested09/29/2024Recreation and Conservation Office (RCO)CBS Habitat Rest. Project$877,800.00
Allocated10/01/2024Recreation and Conservation Office (RCO)CBS Habitat Rest. Project$877,800.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$877,800.00 $877,800.00 $877,800.00 $0.00 $877,800.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chehalis GSU:Tidal Zone
Chinook-Pop (ESU):Chinook-Washington Coast, Not Warranted
Chum-Pop (ESU):Chum-Pacific Coast, Not Warranted
Coho-Pop (ESU):Coho-Southwest Washington, Not Determined
County:Grays Harbor
HUC12:Metcalf Slough-Chehalis River (171001040406)
HUC8:Lower Chehalis (17100104)
Lead Entity Area:Chehalis Basin
Legislative District:19
Salmon Recovery Regions:Washington Coast
Sections:04
Steelhead-Pop (ESU):Steelhead-Washington Coast, Not Warranted
Township:T17NR07W
Watershed Administrative Unit:Lower Chehalis/Elizabeth Creek
WRIA:Lower Chehalis
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.01mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
0.44mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
0.44mi
Number of bridges (C.2.g.2)
1.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.01mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
0.00acres
Instream Pools Created/Added (C.4.c.6)
0.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.00mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.00mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.01mi
Number of structures placed in channel (C.4.d.7)
30.00
Pools Created through channel structure placement (C.4.d.5)
0.00
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
0.10acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.00mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
1.00acres
Miles of streambank planted (C.5.c.4)
ADDITIONAL INFORMATION