Organization | Chehalis Basin Lead Entity |
Sponsor | Chehalis Basin Fisheries Task Force (CBFTF) |
Status | Approved |
Schedule | Start Date: 10/2/2024 End Date: 6/30/2026 |
Category | Category: Restoration |
Type | Date | Funding Org | Funding Program | Match | Amount |
---|---|---|---|---|---|
Requested | 09/29/2024 | Recreation and Conservation Office (RCO) | CBS Habitat Rest. Project | $877,800.00 | |
Allocated | 10/01/2024 | Recreation and Conservation Office (RCO) | CBS Habitat Rest. Project | $877,800.00 |
Grant Project Agreement Totals | Proposed | Requested | Allocated | Spent | Balance |
$877,800.00 | $877,800.00 | $877,800.00 | $0.00 | $877,800.00 |
Type | Date | Funding Org | Funding Program | Match | Amount |
---|
Other Funding Totals | Proposed | Requested | Allocated | Spent | Balance |
Grand Totals | Proposed | Requested | Allocated | Spent | Balance |
Chehalis GSU: | Tidal Zone |
Chinook-Pop (ESU): | Chinook-Washington Coast, Not Warranted |
Chum-Pop (ESU): | Chum-Pacific Coast, Not Warranted |
Coho-Pop (ESU): | Coho-Southwest Washington, Not Determined |
County: | Grays Harbor |
HUC12: | Metcalf Slough-Chehalis River (171001040406) |
HUC8: | Lower Chehalis (17100104) |
Lead Entity Area: | Chehalis Basin |
Legislative District: | 19 |
Salmon Recovery Regions: | Washington Coast |
Sections: | 04 |
Steelhead-Pop (ESU): | Steelhead-Washington Coast, Not Warranted |
Township: | T17NR07W |
Watershed Administrative Unit: | Lower Chehalis/Elizabeth Creek |
WRIA: | Lower Chehalis |
APPLICATION | FINAL | ||||
RESTORATION METRICS | |||||
Miles of Stream and/or Shoreline Treated or Protected (C.0.b) | 0.01 | mi | |||
Fish Passage Improvement | |||||
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1) | 0.44 | mi | |||
*Number of blockages / impediments / barriers impeding passage (C.2.b.4) | 1.00 | ||||
Bridge installed or improved (C.2.g.1) | |||||
Miles of stream made accessible by bridge installation/repair (C.2.g.3) | 0.44 | mi | |||
Number of bridges (C.2.g.2) | 1.00 | ||||
Instream Habitat Project | |||||
Total Miles Of Instream Habitat Treated (C.4.b) | 0.01 | mi | |||
Channel reconfiguration and connectivity (C.4.c.1) | |||||
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5) | 0.00 | acres | |||
Instream Pools Created/Added (C.4.c.6) | 0.00 | ||||
Miles of Off-Channel Stream Created or Connected (C.4.c.4) | 0.00 | mi | |||
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3) | 0.00 | mi | |||
Channel structure placement (C.4.d.1) | |||||
Acres Of Streambed Treated for channel structure placement (C.4.d.4) | |||||
Miles of Stream Treated for channel structure placement (C.4.d.3) | 0.01 | mi | |||
Number of structures placed in channel (C.4.d.7) | 30.00 | ||||
Pools Created through channel structure placement (C.4.d.5) | 0.00 | ||||
Riparian Habitat Project | |||||
*Total Riparian Acres Treated (C.5.b.2) | 0.10 | acres | |||
*Total Riparian Miles Streambank Treated (C.5.b.1) | 0.00 | mi | |||
Planting (C.5.c.1) | |||||
Acres Planted in riparian (C.5.c.3) | 1.00 | acres | |||
Miles of streambank planted (C.5.c.4) |
6_ASRP_CampCreekProjecSummary.docx |