Lucas Crk Trib at MP 4.39- Fish Passage Const-FBRB
#21-1400 #21-1400
Organization Chehalis Basin Lead Entity
Sponsor Lewis County Public Works
Status Active
Schedule Start Date: 7/1/2023 End Date: 6/30/2025
Category Category: Restoration
DESCRIPTION
The proposed restoration project will replace an existing 6 foot (ft) wide by 4 ft tall by 66 ft long corrugated steel squash pipe with a 20 ft wide by 13 ft tall by 78 ft long split box culvert at Lucas Creek Road milepost 4.39 in Lewis County, Washington. The barrier to be replaced, which conveys an unnamed tributary to Lucas Creek, is only 33 percent passable due to a slope 1.7 percent.  The "Prioritized Chehalis Barriers - May 2020" layer in the Chehalis Fish Passage Barrier Prioritization Interactive mapper (May 2020) identifies the existing barrier as a Priority 1 barrier.  Replacement of this culvert is anticipated to restore unimpeded access to 1.88 linear miles of potential habitat for the Southwest Washington ESU of coho salmon and 1.74 linear miles of potential habitat for the Southwest Washington DPS of winter steelhead trout. Additional construction will include 122 feet of realignment/regrade of stream material within the channel to provide passage during all flows.  Channel regrade activities were limited to the minimum distance required to meet stream simulation design. There are no barriers downstream or upstream of this culvert. According to the Lewis Conservation District, who performed a full stream habitat survey of Lucas Creek and its tributaries in 2002, the proposed project will restore access to 3,484 square meters of spawning area and 2,081 square meters of rearing habitat. 
Show more  ↓
FUNDING SOURCES
RCO-Salmon Federal IIJA Projects ($376,150)RCO-BA Fish Barrier Removal Board ($1,045,798)$376,150$1,045,798
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested01/11/2022Lewis County Public WorksMatch$261,450.00
Requested01/11/2022Recreation and Conservation Office (RCO)BA Fish Barrier Removal Board$1,045,798.00
Allocated07/01/2023Recreation and Conservation Office (RCO)Salmon Federal IIJA Projects$376,150.00
Allocated07/01/2023Recreation and Conservation Office (RCO)BA Fish Barrier Removal Board$1,045,798.00
Spent12/09/2024Recreation and Conservation Office (RCO)Salmon Federal IIJA Projects-$376,150.00
Spent05/02/2025Lewis County Public WorksMatch-$0.00
Spent05/02/2025Recreation and Conservation Office (RCO)BA Fish Barrier Removal Board-$826,197.61
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
Not entered $1,307,248.00 $1,421,948.00 $1,202,347.61 $219,600.39
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chehalis GSU:Lucas Cr
Chinook-Pop (ESU):Chinook-Washington Coast, Not Warranted
Chum-Pop (ESU):Chum-Pacific Coast, Not Warranted
Coho-Pop (ESU):Coho-Southwest Washington, Not Determined
County:Lewis
HUC12:North Fork Newaukum River (171001030203)
HUC8:Upper Chehalis (17100103)
Lead Entity Area:Chehalis Basin
Legislative District:20
Salmon Recovery Regions:Washington Coast
Sections:32
Steelhead-Pop (ESU):Steelhead-Washington Coast, Not Warranted
Township:T14NR01E
Watershed Administrative Unit:NF Newaukum
WRIA:Upper Chehalis
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.02mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
1.88mi1.88mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.001.00
Miles Of Stream Made Accessible (FBRB)
1.88mi1.88mi
 Culvert installed or improved (C.2.f.1)    
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
1.88mi1.88mi
Number of culverts (C.2.f.2)
1.001.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.02mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
0.00acres
Instream Pools Created/Added (C.4.c.6)
0.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.00mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.02mi