DESCRIPTION
The purpose of the Fry Creek Habitat Restoration and Flood Risk Reduction project is to improve water quality, restore salmon habitat, correct barriers contributing to salmonid mortality, provide public open space, and reduce flood risk in Fry Creek where it flows through Aberdeen and Hoquiam, underserved communities suffering from long-term economic depression.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested09/17/2020City of AberdeenMatch$520,000.00
Requested09/17/2020Recreation and Conservation Office (RCO)WA Coast Rst Resiliency Proj$2,230,000.00
Allocated08/10/2023City of AberdeenMatch$520,000.00
Allocated08/10/2023Recreation and Conservation Office (RCO)WA Coast Rst Resiliency Proj$2,230,000.00
Spent11/05/2024City of AberdeenMatch-$292,786.15
Spent11/05/2024Recreation and Conservation Office (RCO)WA Coast Rst Resiliency Proj-$1,255,602.14
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$1,915,000.00 $2,750,000.00 $2,750,000.00 $1,548,388.29 $1,201,611.71
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chehalis GSU:Fry Creek
Chinook-Pop (ESU):Chinook-Washington Coast, Not Warranted
Chum-Pop (ESU):Chum-Pacific Coast, Not Warranted
City Areas:Aberdeen
Coho-Pop (ESU):Coho-Southwest Washington, Not Determined
County:Grays Harbor
HUC12:Fry Creek-Frontal Grays Harbor (171001050204)
HUC8:Grays Harbor (17100105)
Lead Entity Area:Chehalis Basin
Legislative District:24
Salmon Recovery Regions:Washington Coast
Sections:07
Steelhead-Pop (ESU):Steelhead-Washington Coast, Not Warranted
Township:T17NR09W
Watershed Administrative Unit:Lower Wishkah
WRIA:Lower Chehalis
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.21mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
0.24mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
2.00
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
0.00mi
Number of bridges (C.2.g.2)
1.00
 Culvert installed or improved (C.2.f.1)    
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
0.00mi
Number of culverts (C.2.f.2)
1.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.21mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
0.00acres
Instream Pools Created/Added (C.4.c.6)
0.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.00mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.21mi
 Plant removal/control (C.4.g.1)    
Acres of Streambed Treated for plant removal/control (C.4.g.4)
0.80acres
Miles of Stream Treated for plant removal/control (C.4.g.3)
0.21mi
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
1.20acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.42mi
 Debris/structures removal (C.5.j.1)    
Acres of Riparian Area Treated. (C.5.j.2)
1.20acres
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
1.20acres
Miles of streambank planted (C.5.c.4)
0.42mi
 Riparian Plant removal / control (C.5.h.1)    
Acres of riparian treated for plant removal/control (C.5.h.3)
1.20acres
Miles of streambank treated for plant removal/control (C.5.h.4)
0.42mi