Frase Creek Fish Barrier Removal
#18-1492 #18-1492
Organization Chehalis Basin Lead Entity
Sponsor Lewis County Public Works
Status Completed
Schedule Start Date: 1/19/2018 End Date: 1/15/2021
Priority 3
Category Category: Restoration
Project Photo
DESCRIPTION
The primary objective of the Frase Creek Barrier Removal is to replace an existing fish passage barrier with a fish passable structure.  Culvert 021(64022)(00529) is an existing 2.13 m x 1.52 m (7 ft x 5 ft) corrugated metal squash pipe, located at MP 0.529 on Pigeon Springs Road, on Frase Creek.  This culvert is under ownership of Lewis County.  It was calculated to be 0 percent passable due to a 1.16 m (3.8 ft) outfall drop, a slope of 2 percent and lack of substrate within the culvert.  The culvert is ranked 18th for replacement within the upper Chehalis Basin and 11th for replacement within Lewis County.  Replacement of this culvert is anticipated to restore access to an additional 2.74 linear miles of potential habitat; 8,442 square meters (2.89 acres) of rearing habitat and 388 square meters (0.10 acres) of spawning habitat.  A priority index has not been generated for this culvert.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested04/09/2018Lewis County Public WorksMatch$402,750.00
Requested04/09/2018Rec. and Conserv. OfficeCBS Habitat Rest. Project$594,591.00
Allocated01/14/2021Lewis County Public WorksMatch$125,091.47
Allocated01/14/2021Rec. and Conserv. OfficeSalmon Federal Projects$255,750.00
Allocated01/14/2021Rec. and Conserv. OfficeCBS Habitat Rest. Project$467,858.15
Spent12/24/2019Rec. and Conserv. OfficeSalmon Federal Projects-$255,750.00
Spent01/30/2020Lewis County Public WorksMatch-$125,091.47
Spent01/30/2020Rec. and Conserv. OfficeCBS Habitat Rest. Project-$467,858.15
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$848,700.00 $997,341.00 $848,699.62 $848,699.62 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PROJECT CONTACT
GRANT MANAGER
LEAD ENTITY COORDINATOR
SPONSOR
PHOTOS

 
LOCATION
Sections:12
Legislative District:20
Lead Entity Area:Chehalis Basin
Chinook-Pop (ESU):Chinook-Washington Coast, Not Warranted
Chum-Pop (ESU):Chum-Pacific Coast, Not Warranted
Coho-Pop (ESU):Coho-Southwest Washington, Not Determined
County:Lewis
HUC12:Middle South Fork Newaukum River (171001030202)
Watershed Administrative Unit:SF Newaukum
Chehalis GSU:SF Newaukum MS
Steelhead-Pop (ESU):Steelhead-Washington Coast, Not Warranted
Township:T13NR01E
WRIA:Upper Chehalis
HUC8:Upper Chehalis (17100103)
Salmon Recovery Regions:Washington Coast
View project on a larger map

Related Projects

ACTIVITY-FISH PASSAGE IMPROVEMENT PCSRF
* Miles of Stream Made Accessible
100%
2.74 Actual
2.74 Planned
Miles
*Number of Blockages/Impediments/Barriers Impeding Passage
100%
1 Actual
1 Planned
Number
ACTIVITY-INSTREAM HABITAT PROJECT PCSRF
Number of structures placed in channel
17%
2 Actual
12 Planned
Number
Total Miles Of Instream Habitat Treated
140%
0.07 Actual
0.05 Planned
Miles
Acres Of Off-Channel/Floodplain Connected Or AddedNot entered
Miles of Off-Channel Stream CreatedNot entered
ACTIVITY-RIPARIAN HABITAT PROJECT PCSRF
* Total Riparian Acres Treated
100%
0.5 Actual
0.5 Planned
Acres
* Total Riparian Miles Streambank Treated
140%
0.07 Actual
0.05 Planned
Miles
Acres Planted in riparian
100%
0.5 Actual
0.5 Planned
Acres