Delezenne Creek Fish Passage Restoration Project
#14-1159 #14-1159
Organization Chehalis Basin Lead Entity
Sponsor Grays Harbor Conservation District
Status Completed
Schedule Start Date: 12/3/2014 End Date: 6/21/2016
Category Category: Restoration
DESCRIPTION
The goal is to provide unimpeded fish passage to the upper 7 miles of the Delezenne stream basin by restoring the stream to its original oxbow channel. This will be done by working cooperatively with the Weyerhaeuser Timber Company and the Boy Scouts of America to install two concrete bridges 55 feet long by 16 feet wide at both ends of the old oxbow. The existing diverted channel will be filled in and the dam and waterfalls will be blocked off. The old oxbow will be excavated in certain locations to allow stream flow. Large woody debris will be added as well as native shrubs planted.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/13/2014Grays Harbor Conservation DistrictMatch$110,000.00
Requested08/13/2014Recreation and Conservation Office (RCO)Salmon State Projects$200,000.00
Allocated06/09/2016Grays Harbor Conservation DistrictMatch$98,070.26
Allocated06/09/2016Recreation and Conservation Office (RCO)Salmon State Projects$178,309.56
Spent06/09/2016Grays Harbor Conservation DistrictMatch-$98,070.26
Spent06/09/2016Recreation and Conservation Office (RCO)Salmon State Projects-$178,309.56
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$276,379.82 $310,000.00 $276,379.82 $276,379.82 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chehalis GSU:Delzene Cr
Chinook-Pop (ESU):Chinook-Washington Coast, Not Warranted
Chum-Pop (ESU):Chum-Pacific Coast, Not Warranted
Coho-Pop (ESU):Coho-Southwest Washington, Not Determined
County:Grays Harbor
HUC12:Delezene Creek (171001040404)
HUC8:Lower Chehalis (17100104)
Lead Entity Area:Chehalis Basin
Legislative District:19
Legislative District:19
Salmon Recovery Regions:Washington Coast
Sections:26
Steelhead-Pop (ESU):Steelhead-Washington Coast, Not Warranted
Township:T17NR06W
Watershed Administrative Unit:Delezene Creek
WRIA:Lower Chehalis
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.01mi0.25mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
7.00mi7.00mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
2.002.00
Square Miles Of streambed made accessible (C.2.b.2)
0.10sq mi0.10sq mi
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
7.00mi7.00mi
Number of bridges (C.2.g.2)
2.002.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.25mi
 Channel reconfiguration and connectivity (C.4.c.1)    
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
0.10acres
Instream Pools Created/Added (C.4.c.6)
0.00
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
0.25mi
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
0.25mi
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
0.10acres
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.25mi
Number of structures placed in channel (C.4.d.7)
8.00
Pools Created through channel structure placement (C.4.d.5)
8.00
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)
7.00yd
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
3.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.50mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
3.00acres
Miles of streambank planted (C.5.c.4)
0.50mi
NOTES

USFWS ID #: 13320a152