QIN S.F. Salmon River Culvert Replacement Project
#11-1393 #11-1393
 Queets River Basin Management Unit Salmon River QIN S.F. Salmon River Culvert Replacement Project
Organization Quinault Indian Nation Lead Entity
Sponsor Quinault Indian Nation
Status Completed
Schedule Start Date: 12/8/2011 End Date: 10/30/2014
Category Category: Restoration
DESCRIPTION
The Quinault Indian Nation will use this grant to replace a culvert that is blocking fish passage in the south fork of the Salmon River on the Quinault Indian Nation Reservation in Grays Harbor County. A 14-foot culvert is restricting fish passage to nearly 6 miles of habitat on the south fork and other tributaries. The culvert will be replaced with a 70-foot-long bridge. The Salmon River is a moderate-sized tributary that flows into the Queets River and supports runs of coho salmon, steelhead trout and cutthroat trout. The culvert is too small, has a steep slope and is passable by only 33% of fish. Removing this barrier and replacing it with a properly designed bridge will allow for fish passage of all life stages. The tribe will contribute $34,770 in staff labor and donations of materials.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested08/23/2011Quinault Indian NationMatch$34,770.00
Requested08/23/2011Recreation and Conservation Office (RCO)Salmon State Projects$197,030.00
Allocated10/30/2014Quinault Indian NationMatch$34,770.00
Allocated10/30/2014Recreation and Conservation Office (RCO)Salmon Federal Projects$197,030.00
Spent10/30/2014Quinault Indian NationMatch-$34,770.00
Spent10/30/2014Recreation and Conservation Office (RCO)Salmon Federal Projects-$197,030.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$231,800.00 $231,800.00 $231,800.00 $231,800.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Washington Coast, Not Warranted
Chum-Pop (ESU):Chum-Pacific Coast, Not Warranted
Coho-Pop (ESU):Coho-Olympic Peninsula, Not Warranted
County:Grays Harbor
HUC12:Salmon River (171001020208)
HUC8:Queets-Quinault (17100102)
Lead Entity Area:Quinault Indian Nation
Legislative District:24
Salmon Recovery Regions:Washington Coast
Sections:01
Sections:02
Steelhead-Pop (ESU):Steelhead-Olympic Peninsula, Not Warranted
Township:T23NR10.5W
Watershed Administrative Unit:Salmon River
WRIA:Queets - Quinault
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.02mi0.02mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
5.80mi5.80mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Square Miles Of streambed made accessible (C.2.b.2)
0.00sq mi0.01sq mi
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
5.80mi5.80mi
Number of bridges (C.2.g.2)
1.001.00
Upland Habitat And Sediment Project    
Acres of Upland Habitat Area Treated (C.6.b.1)
0.80acres0.80acres
Miles of Road Treated (C.6.b.2)
0.03mi0.25mi
 Road drainage system improvements and reconstruction (C.6.c.1)    
Average width of road treated for drainage improvements and reconstruction (C.6.c.3)
Miles of Road Treated for drainage improvements and reconstruction (C.6.c.2)
0.25mi