Lower Quillayute River Restoration
#20-1200 #20-1200
Organization North Pacific Coast Lead Entity
Sponsor Quileute Tribe
Status Completed
Schedule Start Date: 7/1/2021 End Date: 11/27/2024
Category Category: Restoration
Project Photo
DESCRIPTION

The Quileute Tribe will be implementing restoration actions throughout the first two miles of the Quillayute River to restore flood plain connectivity, improve habitat and address erosion at Thunder Field in La Push, Washington. Actions consist of a combination of deformable log jams with a minor log revetment to stabilize the riverbank at Thunder Field as well as construct a boat launch to provide easier access for tribal fisherman. Other actions include excavation of side channels for high flows and to provide off-channel habitat. Log structures will be designed to withstand a 100-year flood event, while also allowing flows to activate the Smith Slough floodplain in a manner that protects the village of La Push from risks of avulsions and flooding.


Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested06/12/2020Quileute TribeMatch$515,700.00
Requested06/12/2020Recreation and Conservation Office (RCO)WA Coast Rst Resiliency Proj$2,000,000.00
Allocated11/27/2024Quileute TribeMatch$514,966.80
Allocated11/27/2024Recreation and Conservation Office (RCO)WA Coast Rst Resiliency Proj$2,041,559.27
Spent10/07/2024Quileute TribeMatch-$514,966.80
Spent10/07/2024Recreation and Conservation Office (RCO)WA Coast Rst Resiliency Proj-$2,041,559.27
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$1,250,000.00 $2,515,700.00 $2,556,526.07 $2,556,526.07 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
ALT PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Washington Coast, Not Warranted
Chum-Pop (ESU):Chum-Pacific Coast, Not Warranted
Coho-Pop (ESU):Coho-Olympic Peninsula, Not Warranted
County:Clallam
HUC12:Quillayute River (171001010608)
HUC8:Hoh-Quillayute (17100101)
Lead Entity Area:North Pacific Coast
Legislative District:24
Salmon Recovery Regions:Washington Coast
Sections:23
Steelhead-Pop (ESU):Steelhead-Olympic Peninsula, Not Warranted
Township:T28NR15W
Watershed Administrative Unit:Quillayute River
WRIA:Soleduc
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
2.00mi2.90mi
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
1.00mi2.90mi
 Channel structure placement (C.4.d.1)    
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.50mi1.83mi
Number of structures placed in channel (C.4.d.7)
46.0054.00
Pools Created through channel structure placement (C.4.d.5)
4.005.00
 Streambank stabilization (C.4.e.1)    
Miles of Streambank Stabilized (C.4.e.3)
0.50mi0.30mi
 Unspecified or other instream habitat project. (C.4.j.1)    
Unspecified Or Other Instream Habitat Project (C.4.j.2)
0.50mi0.00mi
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
8.00acres9.00acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.50mi2.25mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
5.00acres9.00acres
Miles of streambank planted (C.5.c.4)
0.10mi2.25mi
 Unspecified or other riparian habitat project (C.5.k.1)    
Acres of Streambank treated (C.5.k.3)
0.50acres10.00acres
Miles treated for an unspecified or Other Riparian Habitat Project (C.5.k.2)
0.50mi2.50mi
Upland Habitat And Sediment Project    
Acres of Upland Habitat Area Treated (C.6.b.1)
4.00acres3.50acres
Miles of Road Treated (C.6.b.2)
0.10mi0.00mi
 Planting for erosion and sediment control (C.6.f.1)    
Acres planted for erosion and sediment control (C.6.f.3)
0.10acres3.50acres
 Road drainage system improvements and reconstruction (C.6.c.1)    
Miles of Road Treated for drainage improvements and reconstruction (C.6.c.2)
0.10mi0.05mi
 Unspecified or other upland project (C.6.m.1)    
Number of acres improved by unspecified or other upland project (C.6.m.2)
1.00acres0.00acres
ADDITIONAL INFORMATION