Organization | North Pacific Coast Lead Entity |
Sponsor | Quileute Tribe |
Status | Completed |
Schedule | Start Date: 7/1/2021 End Date: 11/27/2024 |
Category | Category: Restoration |
The Quileute Tribe will be implementing restoration actions throughout the first two miles of the Quillayute River to restore flood plain connectivity, improve habitat and address erosion at Thunder Field in La Push, Washington. Actions consist of a combination of deformable log jams with a minor log revetment to stabilize the riverbank at Thunder Field as well as construct a boat launch to provide easier access for tribal fisherman. Other actions include excavation of side channels for high flows and to provide off-channel habitat. Log structures will be designed to withstand a 100-year flood event, while also allowing flows to activate the Smith Slough floodplain in a manner that protects the village of La Push from risks of avulsions and flooding.
Type | Date | Funding Org | Funding Program | Match | Amount |
---|---|---|---|---|---|
Requested | 06/12/2020 | Quileute Tribe | Match | $515,700.00 | |
Requested | 06/12/2020 | Recreation and Conservation Office (RCO) | WA Coast Rst Resiliency Proj | $2,000,000.00 | |
Allocated | 11/27/2024 | Quileute Tribe | Match | $514,966.80 | |
Allocated | 11/27/2024 | Recreation and Conservation Office (RCO) | WA Coast Rst Resiliency Proj | $2,041,559.27 | |
Spent | 10/07/2024 | Quileute Tribe | Match | -$514,966.80 | |
Spent | 10/07/2024 | Recreation and Conservation Office (RCO) | WA Coast Rst Resiliency Proj | -$2,041,559.27 |
Grant Project Agreement Totals | Proposed | Requested | Allocated | Spent | Balance |
$1,250,000.00 | $2,515,700.00 | $2,556,526.07 | $2,556,526.07 | $0.00 |
Type | Date | Funding Org | Funding Program | Match | Amount |
---|
Other Funding Totals | Proposed | Requested | Allocated | Spent | Balance |
Grand Totals | Proposed | Requested | Allocated | Spent | Balance |
Chinook-Pop (ESU): | Chinook-Washington Coast, Not Warranted |
Chum-Pop (ESU): | Chum-Pacific Coast, Not Warranted |
Coho-Pop (ESU): | Coho-Olympic Peninsula, Not Warranted |
County: | Clallam |
HUC12: | Quillayute River (171001010608) |
HUC8: | Hoh-Quillayute (17100101) |
Lead Entity Area: | North Pacific Coast |
Legislative District: | 24 |
Salmon Recovery Regions: | Washington Coast |
Sections: | 23 |
Steelhead-Pop (ESU): | Steelhead-Olympic Peninsula, Not Warranted |
Township: | T28NR15W |
Watershed Administrative Unit: | Quillayute River |
WRIA: | Soleduc |
APPLICATION | FINAL | ||||
RESTORATION METRICS | |||||
Miles of Stream and/or Shoreline Treated or Protected (C.0.b) | 2.00 | mi | 2.90 | mi | |
Instream Habitat Project | |||||
Total Miles Of Instream Habitat Treated (C.4.b) | 1.00 | mi | 2.90 | mi | |
Channel structure placement (C.4.d.1) | |||||
Miles of Stream Treated for channel structure placement (C.4.d.3) | 0.50 | mi | 1.83 | mi | |
Number of structures placed in channel (C.4.d.7) | 46.00 | 54.00 | |||
Pools Created through channel structure placement (C.4.d.5) | 4.00 | 5.00 | |||
Streambank stabilization (C.4.e.1) | |||||
Miles of Streambank Stabilized (C.4.e.3) | 0.50 | mi | 0.30 | mi | |
Unspecified or other instream habitat project. (C.4.j.1) | |||||
Unspecified Or Other Instream Habitat Project (C.4.j.2) | 0.50 | mi | 0.00 | mi | |
Riparian Habitat Project | |||||
*Total Riparian Acres Treated (C.5.b.2) | 8.00 | acres | 9.00 | acres | |
*Total Riparian Miles Streambank Treated (C.5.b.1) | 0.50 | mi | 2.25 | mi | |
Planting (C.5.c.1) | |||||
Acres Planted in riparian (C.5.c.3) | 5.00 | acres | 9.00 | acres | |
Miles of streambank planted (C.5.c.4) | 0.10 | mi | 2.25 | mi | |
Unspecified or other riparian habitat project (C.5.k.1) | |||||
Acres of Streambank treated (C.5.k.3) | 0.50 | acres | 10.00 | acres | |
Miles treated for an unspecified or Other Riparian Habitat Project (C.5.k.2) | 0.50 | mi | 2.50 | mi | |
Upland Habitat And Sediment Project | |||||
Acres of Upland Habitat Area Treated (C.6.b.1) | 4.00 | acres | 3.50 | acres | |
Miles of Road Treated (C.6.b.2) | 0.10 | mi | 0.00 | mi | |
Planting for erosion and sediment control (C.6.f.1) | |||||
Acres planted for erosion and sediment control (C.6.f.3) | 0.10 | acres | 3.50 | acres | |
Road drainage system improvements and reconstruction (C.6.c.1) | |||||
Miles of Road Treated for drainage improvements and reconstruction (C.6.c.2) | 0.10 | mi | 0.05 | mi | |
Unspecified or other upland project (C.6.m.1) | |||||
Number of acres improved by unspecified or other upland project (C.6.m.2) | 1.00 | acres | 0.00 | acres |