Ecotrust - Tangle Creek A & B, Burly Ck
#04-1721 #04-1721
 Quillayute River Basin Management Unit Dickey River Ecotrust - Tangle Creek A & B, Burly Ck
Organization North Pacific Coast Lead Entity
Sponsor Clallam Conservation District
Status Completed
Schedule Start Date: 2/1/2005 End Date: 7/3/2007
Category Category: Restoration
DESCRIPTION

WRIA: 20 Tangle Creek A - This 40 foot long, corrugated steel culvert is fout feet in diameter. The road fill has washed out and the culvert is plugged. Road fill material has deposited in the crossing, causing the stream to run subsurface throught he site, creating a total fish passage barrier much of the year. The estimated project cost is based on a 80' x 14' bridge. The project site is located near the mainstem Dickey River. Correcting this barrier would open 1.86 miles of valuable upstream spawning and rearing habitat for Chinook, chum, coho, cutthroat and steelhead.

Tangle Creek B - This 25 foot flong, round plastic culvert is two feet in diameter. This crossing will be abandoned. Correcting this barrier would provide access to 0.12 miles of valuable upstream spawning and rearing habitat for coho, cutthroat and steelhead.

Burly Creek - This 40 feet long culvert has an outfall drop of .13 meters. A new 7' x 40' round aluminum culvert will be placed opening 0.52 miles of valuable spawning habitat for Chinook, chum, coho, cutthroat and steelhead.

Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
RequestedClallam Conservation DistrictMatch$8,000.00
RequestedRecreation and Conservation Office (RCO)FFFPP Grants$137,000.00
Allocated10/29/2010Clallam Conservation DistrictMatch$12,751.74
Allocated10/29/2010Recreation and Conservation Office (RCO)FFFPP WHIP Grants$114,999.75
Allocated10/29/2010Recreation and Conservation Office (RCO)FFFPP Grants$134,660.61
Spent11/03/2006Recreation and Conservation Office (RCO)FFFPP WHIP Grants-$114,999.75
Spent05/08/2007Clallam Conservation DistrictMatch-$12,751.74
Spent05/08/2007Recreation and Conservation Office (RCO)FFFPP Grants-$134,660.61
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$262,412.00 $145,000.00 $262,412.10 $262,412.10 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
LANDOWNER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Washington Coast, Not Warranted
Chum-Pop (ESU):Chum-Pacific Coast, Not Warranted
Coho-Pop (ESU):Coho-Olympic Peninsula, Not Warranted
County:Clallam
HUC12:East Fork Dickey River (171001010302)
HUC8:Hoh-Quillayute (17100101)
Lead Entity Area:North Pacific Coast
Legislative District:24
Salmon Recovery Regions:Washington Coast
Sections:31
Steelhead-Pop (ESU):Steelhead-Olympic Peninsula, Not Warranted
Township:T30NR13W
Watershed Administrative Unit:EF Dickey
WRIA:Soleduc
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.01mi0.01mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
2.50mi2.50mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
3.00
Miles Of Stream Made Accessible (FFFPP)
Square Miles Of streambed made accessible (C.2.b.2)
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
Number of bridges (C.2.g.2)
 Culvert installed or improved (C.2.f.1)    
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
2.50mi2.50mi
Number of culverts (C.2.f.2)
 Fish passage blockages removed or altered (C.2.c.1)    
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
3.003.00
 Road-crossing removal (C.2.i.1)    
Miles of stream made accessible by road crossing removal (C.2.i.3)
0.00mi0.00mi
Number of road-crossings (C.2.i.2)