Schedule Start Date: 12/12/2008 End Date: 9/12/2011
Category Category: Restoration
Project Photo
DESCRIPTION
The Pacific Coast Salmon Coalition removed the last blockage between over 2 miles of upstream habitat and the main stem of the Hoh River. This was accomplished by removing two 36" culverts that were perched and replaced it with a 35’, three-sided concrete bridge. The original culvert was 6’ X 4’ X 40’ pipe arch (cmpa) that was rusted through the bottom and had an outlet drop and steep, narrow drop (chute) into the inlet. In the winter of 2009 the culvert and road washed out and two 36" plastic pipes were placed as a temporary measure before the 3-sided bridge was placed. Whole downed trees and woody debris were placed in and around the stream along the project area. The entire project area and the area where the bypass road was located was replanted with native plants and vegetation.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested09/08/2008Pacific Coast Salmon CoalitionMatch$100,000.00
Requested09/08/2008Recreation and Conservation Office (RCO)Salmon State Projects$375,406.00
Allocated08/11/2011Pacific Coast Salmon CoalitionMatch$99,828.86
Allocated08/11/2011Recreation and Conservation Office (RCO)Salmon Federal Projects$374,763.55
Spent03/29/2011Recreation and Conservation Office (RCO)Salmon State Projects-$0.00
Spent08/09/2011Pacific Coast Salmon CoalitionMatch-$99,828.86
Spent08/09/2011Recreation and Conservation Office (RCO)Salmon Federal Projects-$374,763.55
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$474,592.41 $475,406.00 $474,592.41 $474,592.41 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Washington Coast, Not Warranted
Chum-Pop (ESU):Chum-Pacific Coast, Not Warranted
Coho-Pop (ESU):Coho-Olympic Peninsula, Not Warranted
County:Jefferson
HUC12:Hell Roaring Creek-Hoh River (171001010706)
HUC8:Hoh-Quillayute (17100101)
Lead Entity Area:North Pacific Coast
Legislative District:24
Salmon Recovery Regions:Washington Coast
Sections:27
Steelhead-Pop (ESU):Steelhead-Olympic Peninsula, Not Warranted
Township:T27NR11W
Watershed Administrative Unit:Middle Hoh
WRIA:Soleduc
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.20mi0.20mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
2.00mi2.00mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Square Miles Of streambed made accessible (C.2.b.2)
0.01sq mi
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
2.00mi
Number of bridges (C.2.g.2)
1.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
 Channel structure placement (C.4.d.1)    
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
Miles of Stream Treated for channel structure placement (C.4.d.3)
Number of structures placed in channel (C.4.d.7)
Pools Created through channel structure placement (C.4.d.5)
Yards Of Average Stream-Width At Mid-Point Of Worksite (C.4.d.6)