Sooes LLC #3- Sooes River Trib R7
#08-2172 #08-2172
Organization North Pacific Coast Lead Entity
Sponsor Clallam Conservation District
Status Completed
Schedule Start Date: 10/6/2009 End Date: 8/5/2011
Category Category: Restoration
Project Photo
DESCRIPTION
This newly corrected crossing is on a tributary to the Sooes River in Clallam County. A physical survey measured 1.0 mile of habitat gain. There is a barrier falls at 890 meters upstream on the left bank trib and the right bank trib has a large wetland. No downstream barriers. Resident cutthroat trout are documented present to and past this barrier. Chinook, chum, coho, and steelhead are present in the Sooes River about 2 miles downstream. An unnamed tributary to the Sooes River, which drains into the Straits is used by both anadromous and resident fish. A culverted crossing that is a barrier due to excessive slope and a hydraulic drop at the outlet blocks upstream passage of these fish to valuable upstream spawning and rearing habitat. The species that will benefit are coho, resident trout, and steelhead. The previous barrier culvert was replaced with a 40' span x 14' wide pre-fabricated weathering steel bridge. .
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested01/26/2010Clallam Conservation DistrictMatch$5,000.00
Requested01/26/2010Recreation and Conservation Office (RCO)FFFPP Grants$110,067.00
Allocated08/05/2011Clallam Conservation DistrictMatch$4,323.19
Allocated08/05/2011Recreation and Conservation Office (RCO)FFFPP Grants$95,168.00
Spent12/02/2010Clallam Conservation DistrictMatch-$4,323.19
Spent12/02/2010Recreation and Conservation Office (RCO)FFFPP Grants-$95,168.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$99,491.19 $115,067.00 $99,491.19 $99,491.19 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Washington Coast, Not Warranted
Chum-Pop (ESU):Chum-Pacific Coast, Not Warranted
Coho-Pop (ESU):Coho-Olympic Peninsula, Not Warranted
County:Clallam
HUC12:Upper Sooes River (171001010101)
HUC8:Hoh-Quillayute (17100101)
Lead Entity Area:North Pacific Coast
Legislative District:24
Salmon Recovery Regions:Washington Coast
Sections:18
Steelhead-Pop (ESU):Steelhead-Olympic Peninsula, Not Warranted
Township:T32NR14W
Watershed Administrative Unit:Sooes
WRIA:Soleduc
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.00mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
1.00mi1.00mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Miles Of Stream Made Accessible (FFFPP)
Square Miles Of streambed made accessible (C.2.b.2)
1.00sq mi
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
1.00mi
Number of bridges (C.2.g.2)
1.00