Anderson - Fletcher Creek; Hoh R. R6
#08-1465 #08-1465
 Hoh River Basin Management Unit Anderson Creek Anderson - Fletcher Creek; Hoh R. R6
Organization North Pacific Coast Lead Entity
Sponsor Pacific Coast Salmon Coalition
Status Completed
Schedule Start Date: 9/26/2008 End Date: 6/23/2011
Category Category: Restoration
Project Photo
DESCRIPTION
On Fletcher creek a 36" diameter culvert owned by a small forest landowner was replaced by a 38' span steel bridge. About 30 to 40 pieces of varying sized woody debris was added to stabilize the structure and banks. Upstream from the barrier correction there is some wetland habitat and a complex stream channel filled with existing large woody debris. In total, about 2.11 miles of habitat was fully opened to searun cutthroat trout, steelhead, and coho salmon. The Pacific Coast Salmon Coalition managed the project implementation and communicated closely with Smayda Environmental Associates, Inc. who designed the removal of the current fish barrier and installation of the bridge and large woody debris correction. Additional project oversight came from staff implementing the Family Forest Fish Passage Program in Washington which is available to small forest landowners. The Family Forest Fish Passage Program and National Fish and Wildlife Fund provided the matching funds for the Community Salmon Fund grant. Upon the completion of the Fletcher Creek Salmon and Trout Passage Restoration project, 1) all native fish species including searun cutthroat, steelhead, and coho salmon,are able to fully access 2.11 miles of upstream habitat on Fletcher Creek; 2) a bridge was installed that is able to pass fish and woody debris that moves down the stream during typical flows, as well as, storm events; and 3) the landowner has continued access over the stream to his forest land.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested04/21/2009Pacific Coast Salmon CoalitionMatch$5,000.00
Requested04/21/2009Recreation and Conservation Office (RCO)FFFPP Grants$95,528.00
Allocated06/06/2011Pacific Coast Salmon CoalitionMatch$4,370.18
Allocated06/06/2011Recreation and Conservation Office (RCO)FFFPP Grants$70,577.82
Spent06/06/2011Pacific Coast Salmon CoalitionMatch-$4,370.18
Spent06/06/2011Recreation and Conservation Office (RCO)FFFPP Grants-$70,577.82
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$100,528.00 $100,528.00 $74,948.00 $74,948.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Washington Coast, Not Warranted
Chum-Pop (ESU):Chum-Pacific Coast, Not Warranted
Coho-Pop (ESU):Coho-Olympic Peninsula, Not Warranted
County:Jefferson
HUC12:Nolan Creek-Hoh River (171001010707)
HUC8:Hoh-Quillayute (17100101)
Lead Entity Area:North Pacific Coast
Legislative District:24
Salmon Recovery Regions:Washington Coast
Sections:28
Steelhead-Pop (ESU):Steelhead-Olympic Peninsula, Not Warranted
Township:T26NR13W
Watershed Administrative Unit:Lower Hoh River
WRIA:Soleduc
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.20mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
2.11mi2.11mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
1.00
Miles Of Stream Made Accessible (FFFPP)
Square Miles Of streambed made accessible (C.2.b.2)
0.00sq mi
 Bridge installed or improved (C.2.g.1)    
Miles of stream made accessible by bridge installation/repair (C.2.g.3)
2.11mi
Number of bridges (C.2.g.2)
1.00
 Culvert installed or improved (C.2.f.1)    
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
2.11mi2.11mi
Number of culverts (C.2.f.2)
1.00
 Fish passage blockages removed or altered (C.2.c.1)    
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
1.001.00
 Road-crossing removal (C.2.i.1)    
Miles of stream made accessible by road crossing removal (C.2.i.3)
0.00mi0.00mi
Number of road-crossings (C.2.i.2)
0.00
ADDITIONAL INFORMATION