Hoh River Trust 2- Hoh Tribs - R6
#06-1720 #06-1720
 Hoh River Basin Management Unit Hoh River  Hoh River Trust 2- Hoh Tribs - R6
Organization North Pacific Coast Lead Entity
Sponsor Hoh River Trust
Status Completed
Schedule Start Date: 1/1/2009 End Date: 3/4/2010
Category Category: Restoration
Project Photo
DESCRIPTION
The Hoh River Trust treated two sites in this project. Site 1 is on an unnamed tributary to the Lower Hoh River with a crossing having two very old damaged culverts. These will be removed and the crossing laid back to natural contours. The road will be decommisioned, producing a larger than normal riparian leave zone. Fish species include coho, cuthroat and sculpins. The Hoh Tribe and Pacific Coastal salmon Coalition are both partners and are very interested in fixing this. The Hoh Tribe will do the revegegation after culvert removals. The second site is on a tributary to Nolan Creek on the Jefferson Pit Rd. and is complex. The existing road was built within a riparian zone and either backed up a wetland on one side or was built through it. The single 24" culvert is regularly plugged by beavers despite replacement after the previous owner's recent harvest. The site has perennial flooding and erosion problems, which both drop sediment into the lower fish creek and block upstream passage. Fish species seen at the culvert were coho and sculpins. The upstream pond/or wetland can dry up in late summer, depending on precip. It may or may not be suitable habitat for anadromous fish, however there are fish habitat upstream of it. Since beavers will likely plug any newer replacement culverts, a hardened ford is proposed for this site. This road must remain open for access to lands past this culvert.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested04/07/2009Recreation and Conservation Office (RCO)FFFPP Grants$24,978.00
Allocated03/04/2010Recreation and Conservation Office (RCO)FFFPP Grants$12,059.08
Spent10/06/2009Hoh River TrustMatch-$0.00
Spent10/06/2009Recreation and Conservation Office (RCO)FFFPP Grants-$12,059.08
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$12,059.00 $24,978.00 $12,059.08 $12,059.08 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Proposed Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PROJECT MANAGER
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Washington Coast, Not Warranted
Chum-Pop (ESU):Chum-Pacific Coast, Not Warranted
Coho-Pop (ESU):Coho-Olympic Peninsula, Not Warranted
County:Jefferson
HUC12:Nolan Creek-Hoh River (171001010707)
HUC8:Hoh-Quillayute (17100101)
Lead Entity Area:North Pacific Coast
Legislative District:24
Salmon Recovery Regions:Washington Coast
Sections:15
Sections:20
Sections:22
Steelhead-Pop (ESU):Steelhead-Olympic Peninsula, Not Warranted
Township:T26NR12W
Township:T26NR13W
Watershed Administrative Unit:Lower Hoh River
WRIA:Soleduc
View project on a larger map
  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
0.00mi0.02mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
1.03mi1.03mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
2.00
Miles Of Stream Made Accessible (FFFPP)
Square Miles Of streambed made accessible (C.2.b.2)
2.00sq mi
 Road-crossing removal (C.2.i.1)    
Miles of stream made accessible by road crossing removal (C.2.i.3)
0.00mi0.40mi
Number of road-crossings (C.2.i.2)
1.00
 Rocked ford - road stream crossing (C.2.h.1)    
Miles of stream made accessible by rocked ford placement (C.2.h.3)
0.63mi
Number of rocked fords (C.2.h.2)
1.00